Upgrade and Service Water Control Gate (Barrage) in Muara Sg. Melaka, Melaka
Project Title: Kerja-kerja Menaiktaraf Dan Membaikpulih Sistem Pintu Kawalan Air (Barrage), Muara Sungai Melaka, Melaka Tengah, Melaka
The authorities of this project were JPS BPME Malaysia, JPS Melaka and Masjid Bandaraya Melaka. The project was in Melaka Barrage, Melaka. The project originated in response to the aging and lack of maintenance of the existing gate control system. The objectives of this project were to improve and upgrade the existing tilting gate and the gate control system. This project cost over RM1.4 million.
The project started in 2020 and took 2 years for completion. The products used in this project were Galvanized Tilting Gate (5.7m height x 6.0m width), Hydraulic Cylinder System, Stoplog and accessories.
Upon completion, the gate control system is now high work efficiency and easy to operate.
Clients: JPS BPME Malaysia, JPS Melaka and Masjid Bandaraya Melaka
Year: 2020 – 2022