OKC > Projects > Mechanical & Electrical System Improvement at Gate of Muar River 1 and 2
WhatsApp Image 2022-12-23 at 2.34.24 PM

Project Title: Kerja-kerja Menaiktaraf Sistem Mekanikal Dan Elektrikal Serta Kerja-kerja lain yang berkaitan Di Pintu Air Sungai Muar 1 Dan Pintu Air Sungai Muar 2, Daerah Kuala Pilah, Negeri Sembilan.

Project Desciption

This project involved 4 parties: JPS Negeri Sembilan, JPS BPME Malaysia, MAFI (Ministry of Agriculture and Food Industries) and TNB (National Energy Limited). The location of this project was at Muar River, Negeri Sembilan. The objectives of this project were to upgrade the existing water control gate system and to install a new pumping system for irrigation purposes. The cost of this project was nearly RM1.8 million. 

The project was started in December 2020 and estimated to be completed in February 2023. The products used in this project were radial gate, hoisting system, pumping system,electrical system, roofing, railing and accessories.

Client: JPS Negeri Sembilan, JPS BPME Malaysia, MAFI and TNB

Year: Dec 2020 – Feb 2023